http://www.tunnelbuilder.it/headline_1806_3.htm
http://www.tunnelbuilder.it/headline_4806_2.htm
Apertura...2009?
Nel frattempo ho scoperto un altro sito: http://www.tunnelmachines.com/
Italy
Castellanza - it/33
Railway
Restricted invitation to tender for construction of 4 km-long railway line with 2 km tunnel. Deadline 28th February, 2000. Contact Ferrovie Nord, Milan, fax +39 02 869 2838. January 2000.
Restricted tendering, deadline 1st March, 2002 for the construction of two shield-driven tunnels, 3.7 km-long, under river Olona, four connecting tunnels to be bored using traditional methods, and eight shafts (launch and exit shafts, ventilation, emergency exit, etc.). Budget of €46.6 million. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 16, document 11783-2002 or contact Ferrovie Nord Milano, Milan, fax +39 028691231. 05/02.
Strabag, Torno Internazionale, Cogeis and Romagnoli secured a EUR36.7 million contract from Ferrovie Nord Milano (FNM) to sink underground the tracks in Castellanza, including 2 x 1,855 m of bored tunnel and 2 x 1.9 km in cut-and-cover. The bored tunnel will be dug using a revamped 8.15 m-diameter Wirth TBM, previously used on the Jubilee Line extension in London. Finished diameter will be 7.15 m. Lining with 30 cm-thick concrete segments, eight pieces plus the key per ring. The launch shaft is under construction. TBM start in June 2005 for completion in June 2006. Also four cross passages between both tubes. Visit www.wirth-europe.de, www.strabag.at, www.torno.com, www.cogeis.it and www.romagnoli.net 09/05.