Torno Internazionale secured a EUR48 million contract for the civil engineering of the 1.6 km Dergano-Affori FNM extension to Line 3 with two stations in Affori Centro and Affori FNM. From Dergano, this dual-track tunnel includes two 8.7 m-diameter bored stretches, 338 m and 700 m in length, separated by a 10 m-long conical junction at the entrance of Affori Centro station, a 96.5 m-long 8.9 m-diameter cut-and-cover portion, a 51 m-long 8.7 m-diameter bored tunnel segment and a 82.4 m-long 8.7 m-diameter cut-and-cover stretch. Visit www.torno.com 02/05.
karenwalker832000 wrote:ho trovato questo link..ci sono le immagini di come sara la stazione affori della M3 a colori..non so se le avete gia' viste..ma ve le mando
http://www.ferrovie.it/phpBB2/viewtopic ... 5f2b64d51e
Users browsing this forum: Google [Bot] and 32 guests